The Playhouse

A study in line, Color and Geometry, leading to the use of a grid and patterns prior to formal design. A house on concrete piles was latter built by the Owner as a permanent residence in Redington Beach, Florida. Rafael Martinez Architect Phone: (813) 393-8339 e-mail: martinr33624@yahoo.com

Published
Categorized as Commercial

MacDill A.F.B, Administrative Facility

MacDill Air Force Base Medical and Administrative facility. CATCHMENT area Facility of 5,400 sf medical and administrative office building built for use by the Department of the Air Force at MacDill A.F.B. The Medical facility houses office and Administrative areas, medical files storage areas, waiting area, patient contact area, a classroom, conference room and lobby.… Continue reading MacDill A.F.B, Administrative Facility

Published
Categorized as Commercial

Manufacturer’s Outlet Center, Westchester County, Mount Kisco, New York.

This Mall located in Westchester County, Mount Kisco, New York, was designed to appear as a Tudor Barn including grain silos. This mall had an inherently critical problem with line of sight to the merchandise. The mall was designed with an intermediate mall floor with stairs leading down to the First Floor of shops and… Continue reading Manufacturer’s Outlet Center, Westchester County, Mount Kisco, New York.

Published
Categorized as Commercial

Manufacturer’s Outlet Center, Fort Walton Beach

This retail center was purchased during the Savings and Loans crisis. The Owner renovated the shopping center by removing sloped the sloped barrel tile roof and erecting parapet walls that hold uniformed signage in blue letters. Below a red striped lighting that provides a Red stipe lighting down on the covered walks.

Published
Categorized as Commercial